Factory Relocation and Re-installation

Plant relocation A-to-Z: dismantling, logistics, reinstallation, recommissioning. Production-loss minimization with phased plans.

What is Factory Relocation?

Factory relocation is a complex project where electrical infrastructure (panels, transformers, MV cells, PLCs, motors) must be dismantled, transported and recommissioned without losing data, settings or compliance certifications.

Our Expertise

Over 45 years we have moved 50+ industrial plants ranging from food production lines to OIZ-tier metalworking facilities. Each project starts with a layout study and ends with full commissioning reports.

Our Service Scope

Pre-Move Survey & Plan

Equipment inventory, electrical schematics, layout planning, risk assessment.

Dismantling & Tagging

Cable identification, tagging, careful disassembly preserving connection records.

Transport & Reinstallation

Logistics coordination, foundation prep at new site, reinstallation per original layout or improved version.

Commissioning & Handover

Connection tests, energy-on procedure, production-line ramp-up support and documentation.

Benefits We Deliver

  • Minimal production downtime via phased planning
  • Cable/equipment identity preserved during move
  • Optional layout improvements with no extra setup cost
  • Full electrical compliance documentation post-move
  • Single accountable contractor end-to-end

Who We Serve

Factories relocating to new OIZs, plants downsizing or expanding, businesses moving to larger premises, multi-site consolidation projects.

📞 Call Me Back

Leave your number, we'll call you as soon as possible.

Urgent? Call directly: +90 535 729 49 25

FAQ

Frequently Asked Questions

How long does a typical factory relocation take?

A medium-sized facility (25-50 motors) typically takes 7-14 working days end-to-end, including dismantling and recommissioning.

Will my equipment lose its certifications?

No. We preserve nameplate data, connection records and original test certificates. Recommissioning includes recompliance testing where required.

Can production continue during the move?

Yes — we run phased plans where critical lines are moved last, allowing partial production until cutover. Discussed in pre-move planning.